Project Completion: 2006
This project consisted of a new one-story wood frame building with cementitious siding on load bearing walls, concrete monolithic footings, concrete floor slabs on grade, pre-engineered wood trusses, sloped plywood roof decks topped with shingles. Specialties include signs, bathroom accessories, and a movable partition. The new building was heated and air-conditioned with a central system. Plumbing work includes fixtures, soil and waste system and hot and cold water distribution system. Patient Rooms were air-conditioned by thru-wall packaged units.