
Unbuilt
StorQuest Express Self Storage Storage
New Facility Cocoa Beach
Our team provided drafting and 3D modeling for this design / build of a new personal storage facility. The buildings are pre-engineer structures, and include office space, restrooms, conditioned storage, and unconditioned storage. The project was placed on hold during the permit phase.
Hernando County Fire Rescue Station No. 6 Crew Quarters Addition
Renderings were produced during the interview phase for the Hernando County Fire Rescue Station No. 6 crew quarters addition. The program included an existing apparatus, crew quarters, a full service kitchen, and equipment lockers. Our team was subsequently awarded the project and construction was completed in 2024.
Custom House
This 2,800 sq. ft. new single family home included a master bedroom suite and bathroom with good views, laundry room, living space, garage, two small bedrooms, and kitchen. The site is sloped down to the creek with an elevation change of approximately 20 feet. The project was placed on hold during design development.
Putnam County
Animal Control Facility Conceptual Design
Our team proposed a design-build approach for the Putnam County Animal Control facility emphasizing collaboration, efficiency, and budget control. This conceptual design accommodated user needs while ensuring flexibility for future growth. Key priorities include animal welfare, staff safety, proper ventilation, lighting, and functional layouts. The facility will feature welcoming public spaces and efficient workflows.
Alachua County Public Schools
Camp Crystal Master Planning
The proposed master plan included 9 phases for infrastructure upgrades, renovations, new buildings, modular buildings, building expansions, and repairs on a 140 acre site. Facility uses included residential cabins, an industrial kitchen, dining area, and multi-purpose buildings. Site improvements included leveling a soccer field, bus loop renovation, and the addition of shade structures. The written report consisted of an existing conditions assessment, a comprehensive detailed strategy to guide future developments, and cost estimates.
Meyers & Briggs Foundation
New Offices Building
Combining two separate offices into one single location required demo of an existing building and design of a new 8,000 sq. ft. office building with a occupiable roof deck on the second level. The building design was centered around a pedestrian-oriented plaza space with a mature oak tree. This project was placed on hold during the design development phase.
Bradford County
New Emergency Operations Center (EOC) + 911 Call Center
This project was completed for Bradford County in 2022. The program includes an 1800 square foot operations room, secondary meeting and conference spaces, kitchen, quiet room, offices, and showers. The building also includes a 911 dispatch/call center and is designed as a storm shelter to ICC-500 criteria. Consideration was given to the day-to-day use of the building as well as the emergency functions it would serve. State funding for construction and site design is in process.
University of Florida
Library West New Colonnade Conceptual Design
Conceptual design was completed for a new Colonnade for students along the southern edge of Library West at the University of Florida. The colonnade would provide shelter and flexible outdoor student workspaces with plenty of natural light. 3D renderings and conceptual plans were developed for fundraising efforts. This project is still in the fundraising stage and has been revisited three times in the last ten years to update code requirements.
City of Lake City
City Hall Feasibility Analysis
This project involved programming and preliminary design analysis for a new City Hall building accommodating 40 employees with future growth. A space needs assessment covered multiple departments, including Administration, IT, and Finance. Surveys identified requirements, adjacencies, and security needs. A detailed program with narratives and diagrams illustrated departmental relationships and public access. Three design options were developed, each with budget estimates based on square-foot costs and rendering.


























































